Please use this identifier to cite or link to this item:
http://theses.ncl.ac.uk/jspui/handle/10443/3280
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Emovon, Ikuobase | - |
dc.date.accessioned | 2017-02-06T15:08:05Z | - |
dc.date.available | 2017-02-06T15:08:05Z | - |
dc.date.issued | 2016 | - |
dc.identifier.uri | http://hdl.handle.net/10443/3280 | - |
dc.description | PhD Thesis | en_US |
dc.description.abstract | For ship systems to remain reliable and safe they must be effectively maintained through a sound maintenance management system. The three major elements of maintenance management systems are; risk assessment, maintenance strategy selection and maintenance task interval determination. The implementation of these elements will generally determine the level of ship system safety and reliability. Reliability Centred Maintenance (RCM) is one method that can be used to optimise maintenance management systems. However the tools used within the framework of the RCM methodology have limitations which may compromise the efficiency of RCM in achieving the desired results. This research presents the development of tools to support the RCM methodology and improve its effectiveness in marine maintenance system applications. Each of the three elements of the maintenance management system has been considered in turn. With regard to risk assessment, two Multi-Criteria Decision Making techniques (MCDM); Vlsekriterijumska Optimizacija Ikompromisno Resenje, meaning: Multi-criteria Optimization and Compromise Solution (VIKOR) and Compromise Programming (CP) have been integrated into Failure Mode and Effects Analysis (FMEA) along with a novel averaging technique which allows the use of incomplete or imprecise failure data. Three hybrid MCDM techniques have then been compared for maintenance strategy selection; an integrated Delphi-Analytical Hierarchy Process (AHP) methodology, an integrated Delphi-AHP-PROMETHEE (Preference Ranking Organisation METHod for Enrichment Evaluation) methodology and an integrated Delphi-AHP-TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) methodology. Maintenance task interval determination has been implemented using a MCDM framework integrating a delay time model to determine the optimum inspection interval and using the age replacement model for the scheduled replacement tasks. A case study based on a marine Diesel engine has been developed with input from experts in the field to demonstrate the effectiveness of the proposed methodologies. | en_US |
dc.description.sponsorship | Tertiary Education Trust Fund (TETFUND), a scholarship body of the Federal Republic of Nigeria for providing the fund for this research. My gratitude also goes to Federal University of Petroleum Resource, Effurun, Nigeria for giving me the opportunity to be a beneficiary of the scholarship. | en_US |
dc.language.iso | en | en_US |
dc.publisher | Newcastle University | en_US |
dc.title | Multi-criteria decision making support tools for maintenance of marine machinery systems | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | School of Marine Science and Technology |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Emovon, I 2016.pdf | Thesis | 7.71 MB | Adobe PDF | View/Open |
dspacelicence.pdf | Licence | 43.82 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.